COORDINATION · DESIGN VS CONSTRAINT
Coordination is where design meets the engineer's reality. The note language:
Read it as a negotiation, not a defeat — the building gets better when both sides win.
The main supply duct clashes with the primary beam at grid C. We can reroute the duct around the beam, but that drops the corridor ceiling by 200 mm, which may affect your clear height. Alternatively, we coordinate a penetration through the beam, which keeps the ceiling but needs structural sign-off. The design intent is a generous corridor; the constraint is the beam depth. Your call on which way to go.
What is the clash?
Rerouting the duct affects the design intent because it…
What is the word for two elements competing for the same space? a